Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2021 at 7:00 PM
Updated July 2, 2025
Site work for a water / sewer project in Jacksonville Beach, Florida. Completed plans call for site work for a water / sewer project.
This project consists of, but is not limited to, the following: Construction of 520 linear feet (LF) of 8-inch gravity sewer, three sanitary manholes, installation of sewer lateral piping within the right-of-way, installation of sewer yard piping service lines for five residential properties, reconstruction and restoration of roadway, driveways, sidewalks, landscaping, and all other work required for construction of the project. Each bid must contain either evidence of the Bidder's qualifications to do business in the area where the projects are located or covenant to obtain such qualifications prior to award of Contract. To demonstrate his qualifications to perform the Work, each bidder shall submit with his Bid written evidence as to the financial status, previous successful contractual and technical experience in similar work including references, description, and volume of present commitments, evidence of possession of, or covenant to obtain prior to award of Contract, valid state, county, and local licenses covering all operations and all areas of political jurisdiction involved in the Work of this project and such other data as may be requested by the CITY. No bidder/company will be issued a contract for the work, who in the past seven (7) years has filed for bankruptcy personally or has been an owner/officer or principal of a firm, which has filed bankruptcy in the past seven (7) years. The CONTRACTOR must be able to exhibit to the City of Jacksonville Beach that he can perform a minimum of 30% of the total contract work with their own labor work force. ECS Project No. 35:31192 1. The Contractor shall furnish all labor, superintendence, materials, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Construction Manager, and in strict accordance with the Contract Documents. The Contractor shall clean up the work and maintain it during and after construction, until accepted, and shall do all work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. 2. The cost of incidental work described in these General Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore. 3. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Construction Manager notwithstanding. 4. The Contractor shall restore all City and private property, damaged by construction, to its original condition as soon as practical. In addition, access to businesses located adjacent to the project site must be maintained at all times. 5. The Contractor shall make exploratory excavations at locations of proposed work, subject to prior written City and FDOT approval, and existing utilities. If there is a potential conflict, the Contractor is to notify the Engineer immediately. Information on the obstruction to be furnished by the Contractor shall include location, elevation, utility type, material, and size. 6. The Contractor shall pay for all inspections during the progress of the Work required and provided by the City of all existing public utilities paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be considered as part of the general cost of doing the Work and shall be included in the lump sum price as provided in the bid form for the Contract.
Post-Bid
Water / Sewer
$900,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2021
December 31, 2021
Penman Rd, Jacksonville Beach, FL
Related To This Project
Jacksonville Beach, FL
Bid Date: Mar 05 2019
Jacksonville Beach, FL
Bid Date: Aug 06 2025
Jacksonville Beach, FL
Bid Date: Jul 30 2025
Jacksonville Beach, FL
Bid Date: Jul 30 2025
Jacksonville Beach, FL
Bid Date: Aug 20 2025
Jacksonville Beach, FL
Bid Date: Aug 25 2025
Jacksonville Beach, FL
Bid Date: Sep 10 2025
Jacksonville Beach, FL
--
Jacksonville Beach, FL
Bid Date: Jul 30 2025
Jacksonville Beach, FL
Bid Date: Aug 06 2025
Jacksonville Beach, FL
Bid Date: Jul 09 2025
Jacksonville Beach, FL
Bid Date: Jun 11 2025
Jacksonville Beach, FL
Bid Date: May 14 2025
Jacksonville Beach, FL
Bid Date: Jul 03 2025
Jacksonville Beach, FL
Bid Date: May 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
