BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Work shall consist of, but not limited to, abandoning and removing existing water main piping and appurtenances, furnishing and installing new water main piping and appurtenances; replacing concrete structures, including driveways, curb and gutter, cross gutter and spandrels, and access ramps; sewer lining, drop manhole connection; pulverizing existing roadway section, constructing cement treated base, construction of new asphalt concrete pavement, adjustment of sewer manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work. The time of completion of contract shall be eighty (80) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $2,100 per calendar day. The City intends to issue a Notice to Proceed on or before January 31, 2022 December 21, 2021 Award of Contract to Lowest Responsible Bidder January 13, 2022 Contractor to submit agreement, bonds, insurance documents, Water Pollution Control Documents. January 17, 2022 Preconstruction Meeting January 31, 2022 Notice to Proceed/Start Construction Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2018. All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. If the City Council makes an award, it will be to the lowest responsible bidder. For Unit Price bids, in the event there is a discrepancy between the extension and the unit cost, the unit cost will prevail. Any questions regarding this bid package may be referred to Jose Medina, Public Works Department Engineering Division at 714.738.6863. In the awarding of the contract, the City shall give equal opportunity to all bidders, regardless of sex, race, creed, color, national, or ethnic origin. The City Council reserves the right to reject any and all bids, to waive any informality in the bidding, and to accept any bid or portion thereof, by order of the City Council of the City of Fullerton.

Award

Water / Sewer

$1,869,150.00

Public - City

Paving, Site Work

22

7

4

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
2,314
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

January 31, 2022

img_map_placeholder

Multiple Locations, Fullerton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.