Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a civil project in Joliet, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.
Job No. V-91-006-22, I-80 - Ridge Road to River Rd, I-80 at Shepley Road, Phase III Project, Will County, Region One/District One. This project requires 25% DBE participation, or if the contract goal is not met, documentedevidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 10, 2022 at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, 62N31: This is a shoulder reconstruction and temporary pavement widening project. Existing HMA surface and PCC base course shoulders will be removed and replaced with temporary HMA surface and binder course or with temporary PCC pavement. The work to be performed under this contract consists of temporary pavement construction, select median and shoulder reconstruction/rehabilitation, ditch grading, temporary drainage improvements, traffic staging, temporary lighting, earthwork, erosion control, construction layout, installation of pavement marking, landscaping, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. 62N41: The work on this project will consist of a bridge replacement and installation of protective shielding. Work will also include approach roadway improvements consisting of pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control along the roadway to the east and west of the structure, and any other work necessary to complete the project as shown on the plans and as described herein. Existing HMA pavement will be removed and replaced with HMA surface and binder course and HMA shoulders and all incidental and collateral work necessary to complete the project as shown on the plans and as described in the special provisions. The following structures may be in this project: o S.N. 099-0179: Existing Shepley Road over I-80 o S.N. 099-8303: Proposed Shepley Road over I-80 The anticipated construction completion date is October 31, 2022. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Prequalified firms may indicate their desire to be considered for selection on any of the projects listed herein by submitting a separate Statement of Interest (SOI) for each project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The method of contractor selection has not been determined at this time. IDOT - 10 - RFQ Engineering - Ridge Road to River Road, I-80 at Shepley Road, Phase III Project
Design
Roads / Highways
$4,000,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2022
Interstate 80, Joliet, IL
Related To This Project
Joliet, IL
Bid Date: Dec 15 2021
Joliet, IL
Bid Date: Dec 20 2021
Joliet, IL
Bid Date: Jan 21 2022
Joliet, IL
Bid Date: Aug 17 2021
Joliet, IL
Bid Date: Dec 20 2021
Joliet, IL
--
Joliet, IL
Bid Date: Feb 03 2022
Joliet, IL
Bid Date: Dec 20 2021
Joliet, IL
Bid Date: Dec 07 2021
Joliet, IL
Bid Date: Jan 06 2022
Joliet, IL
Bid Date: Jan 07 2022
Joliet, IL
Bid Date: Dec 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.