Site work, paving and outdoor lighting for a civil project in Joliet, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

Job No. V-91-006-22, I-80 - Ridge Road to River Rd, I-80 at Shepley Road, Phase III Project, Will County, Region One/District One. This project requires 25% DBE participation, or if the contract goal is not met, documentedevidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on February 10, 2022 at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering is required to provide construction inspection services for the above subject improvement. Work includes, but is not limited to, 62N31: This is a shoulder reconstruction and temporary pavement widening project. Existing HMA surface and PCC base course shoulders will be removed and replaced with temporary HMA surface and binder course or with temporary PCC pavement. The work to be performed under this contract consists of temporary pavement construction, select median and shoulder reconstruction/rehabilitation, ditch grading, temporary drainage improvements, traffic staging, temporary lighting, earthwork, erosion control, construction layout, installation of pavement marking, landscaping, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. 62N41: The work on this project will consist of a bridge replacement and installation of protective shielding. Work will also include approach roadway improvements consisting of pavement reconstruction, shoulder construction, guardrail replacement, and maintenance of traffic control along the roadway to the east and west of the structure, and any other work necessary to complete the project as shown on the plans and as described herein. Existing HMA pavement will be removed and replaced with HMA surface and binder course and HMA shoulders and all incidental and collateral work necessary to complete the project as shown on the plans and as described in the special provisions. The following structures may be in this project: o S.N. 099-0179: Existing Shepley Road over I-80 o S.N. 099-8303: Proposed Shepley Road over I-80 The anticipated construction completion date is October 31, 2022. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Prequalified firms may indicate their desire to be considered for selection on any of the projects listed herein by submitting a separate Statement of Interest (SOI) for each project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The method of contractor selection has not been determined at this time. IDOT - 10 - RFQ Engineering - Ridge Road to River Road, I-80 at Shepley Road, Phase III Project

Design

Roads / Highways

$4,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
90
Bidding Soon
1,749
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2022

img_map_placeholder

Interstate 80, Joliet, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.