EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 3, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Hastings, Pennsylvania. Completed plans call for site work for a water / sewer project.

The installation of approximately 6200 L.F. of 8", 6" and 4" Water Main, service lines, hydrants and all necessary appurtenances. Contract 2021-1: The installation of approximately 1850 L.F. of 8", 6" and 4" Water Main, service lines, hydrants and all necessary appurtenances. A $10.00 fee for postage and handling will be required for Contract Documents that are mailed to bidders. A certified check or bank draft, payable to the order of the Owner or negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price and Highway Restoration Bond on the forms provided, with a surety company listed on the Treasury Department's most current list (Circular 570 as amended). Davis Bacon wage rates will apply to this contract. The contract documents contain requirements addressing prevailing labor wage rates, labor standards, nondiscrimination in hiring practices and related matters. All contractors and subcontractors shall comply with the Public Works Employment Verifications Act. The Act requires the contractor to verify employment eligibility through the e-verify program operated by the United States Department of Homeland Security as a precondition of being awarded a contract for this project. The contract documents contain information and verification Form regarding the Act. The Owner shall award the contract to the lowest responsible bidder or shall reject all bids within 60 days of the date of the bid opening, and no bidder may withdraw his bid before the expiration of such 60-day period; PROVIDED, however, that if the award of the contract is delayed by a required approval of another government agency, the sale of bonds or the award of the grant or grants, the Owner shall reject all bids or award the contract to the lowest responsible bidder within 120 days of the date of the BID opening, and no bidder may withdraw his bid before the expiration of such 120-day period. Thirty (30) day extensions of the date for the award of the contract may be made by the mutual written consent of the Owner and the lowest responsible bidder. The "Steel Products Procurement Act" and "American Iron and Steel" applies to this project for all steel used for construction. Bidders for this contract shall have completed projects similar in character and scope and will be required to provide with their Bid a Qualifications Statement for prime contractor and all subcontractors. Addenda, if any, will be issued to only those persons whose names and address are on record with Stiffler, & Associates, Inc. as having purchased a copy of the Contract Documents. The Owner reserve the right to reject any or all bids or to waive any informalities in the bidding.

Award

Water / Sewer

$2,276,864.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
94
Bidding Soon
778
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 10, 2022

img_map_placeholder

Multiple Locations, Hastings, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hastings CIP Waterline Replacement Project - Contract 2021-1 and Contract 2021-2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.