Published November 20, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in Huntingdon, Pennsylvania. Completed plans call for the renovation of a detention facility.

This PROJECT IS A REVISED REBID STANDARD LOW BID PROJECT and includes HVAC CONSTRUCTION. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .2 HVAC Construction - ALL BASE BIDS (#1 & #2) SDB = 9% VBE = 3% ESTIMATED RANGE: .2 HVAC - $1,000,000 - $2,000,000 LIQUIDATED DAMAGES = (.2) $750.00 per day. There is no Bid Guaranty required for this Project.

Bid Results

Jails / Prisons

$3,830,000.00

Public - State/Provincial

Renovation

19

16

10

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
49
Bidding Soon
605
All Active Projects
290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2023

January 12, 2024

img_map_placeholder

1100 Pike St, Huntingdon, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SCI Huntingdon Replace Condensate - Phase 1 Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.