Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Warrior, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
County : Blount Constructing the Widening, Resurfacing, and Traffic Stripe on CR-8 (Skyline Drive) from the junction of Rickwood Caverns Road to a point easterly at MP 4.355 west of Smoke Rise. Length 2.140 mi. The Bracket Estimate on this project is from $234,292 to $286,357 . Contract Time: 35 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 004 - Widening, Resurfacing, and Traffic Stripe on CR-8 (Skyline Drive) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$392,702.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2021
January 3, 2022
Skyline Dr, Warrior, AL
Related To This Project
Warrior, AL
Bid Date: Jun 16 2022
Warrior, AL
--
Warrior, AL
Bid Date: Jun 16 2022
Warrior, AL
--
Warrior, AL
Bid Date: Apr 07 2023
Warrior, AL
Bid Date: Mar 17 2022
Warrior, AL
Bid Date: Mar 17 2022
Warrior, AL
Bid Date: Mar 17 2022
Warrior, AL
Bid Date: May 03 2022
Anniston, AL
Bid Date: Apr 28 2022
Alexander City, AL
Bid Date: Jan 05 2022
Birmingham, AL
Bid Date: Mar 10 2022
Saraland, AL
--
Montgomery, AL
Bid Date: Apr 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.