BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Greenville, Illinois. Completed plans call for the renovation of a water / sewer project.

The Project includes the following Work: Installation of Sodium Hypochlorite feed system, Ammonium Sulfate feed system, and a clearwell mixer. Bids are requested for the following Contract: City of Greenville Alterations to WTP Chemical Feed System Obtaining. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Printed copies of the Bidding Documents may be obtained from the Issuing Office by paying a fee of $25.00 for each set. Deposit checks for bidding documents should be made to Milano & Grunloh Engineers, LLC. There will be no refunds issued for bidding documents. Pre-bid Conference -N/A Instructions to Bidders: For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The number of days to achieve Substantial Completion is 180 from the date stated above for the commencement of the Contract Times, resulting in a date for Substantial Completion of ; and the number of days to achieve readiness for final payment is 360 from the commencement date of the Contract Times. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price. Site Visit and Testing by Bidders-N/A

Award

Water / Sewer

$89,960.00

Public - City

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
37
Bidding Soon
744
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2021

December 22, 2021

img_map_placeholder

To Be Determined, Greenville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.