BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a municipal facility in Greenville, Illinois. Completed plans call for the renovation of a municipal facility.

The Public Building Commission of Bond County is seeking bids for the replacement of an existing steam boiler at Bond County Courthouse in Greenville, IL. There will not be a pre-bid meeting for this project. Contractor shall pay not less than the prevailing rates of S. Second St., wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). 664- The Public Building Commission of Bond County reserves the right to accept or reject any or all bids.

Post-Bid

Municipal

$300,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
88
Bidding Soon
1,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

September 29, 2023

Project location map

200 W College Ave, Greenville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.