Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of a water / sewer project in Crown Point, New York. Completed plans call for the renovation of a water / sewer project.
As of 12/21/2021 project was not yet been awarded. No estimated time frame yet. The project will be bid and awarded as four (4) Prime Contracts: General Construction (GC), Mechanical (M), Electrical (E) and Plumbing/Process (P). Work is generally described as follows; General Construction (GC): The contract includes water production and treatment upgrades for the municipal water system, consisting of 2 water treatment plant and a water storage tank. The project includes removal of existing concrete structures, piping, equipment upgrades and miscellaneous site improvements. Electrical (E): The contract includes providing site and building control and power wiring and terminations, electrical demolition, and associated work for the upgrade of municipal water infrastructure. Work generally includes plant upgrades, new installations, modifications to existing equipment for wiring, wiring new and relocated equipment, and miscellaneous improvements. Plumbing/Process (P): The contract includes new and upgraded SCADA control system, instrumentation, process piping, valving, and supports, and associated work for the upgrade of the municipal water system. Mechanical (M): The contract includes construction and improvements to HVAC systems and miscellaneous mechanical improvements. The Project is located in Crown Point, New York. Bids shall be submitted on the provided forms in accordance with the Instructions to Bidders. Each Bid must be accompanied by a security deposit in the amount of 5% of the Bid and subject to the conditions provided in the Instruction to Bidders. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond. Contractor’s bids are irrevocable for a period of (45) days after submission. The Owner requires the project to be substantially completed on or before November 1, 2022
Award
Water / Sewer
$410,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2021
January 10, 2022
Multiple Locations, Crown Point, NY
Related To This Project
Crown Point, NY
Bid Date: Oct 20 2021
Crown Point, NY
Bid Date: Jan 08 2025
Crown Point, NY
--
Crown Point, NY
Bid Date: Sep 13 2024
Crown Point, NY
Bid Date: Jan 08 2025
Crown Point, NY
Bid Date: Dec 26 2024
Crown Point, NY
Bid Date: Apr 15 2025
Crown Point, NY
Bid Date: Oct 20 2021
Crown Point, NY
Bid Date: Jan 12 2022
Crown Point, NY
Bid Date: Jan 12 2022
Crown Point, NY
Bid Date: Jan 12 2022
Crown Point, NY
Bid Date: May 10 2023
Crown Point, NY
--
Crown Point, NY
Bid Date: Sep 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
