Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 8, 2021 at 7:00 PM
Updated August 21, 2025
Site work and new construction of an educational facility in Clarksville, Tennessee. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
**As of December 7, 2021, project was awarded to RG Anderson Company for $84,102,000.00. The project start sometime in January 2022 and will be completed on the end of June 2023. Project no: 1345, 2021-122 Project Location: 2702 Rossview Road, Clarksville TN 37040 beside Kirkwood Middle School. Kirkwood High School is the second school to be built in a three-school campus. The high school site totals 67.74 acres and is a portion of the overall 114-acre campus site. A Campus Site package is currently under construction. The Campus Site package includes mass grading of the entire campus, construction of campus roadways, storm drainage, and utility (water, sewer, gas, electric) infrastructure. The work of the Campus Site Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. The adjoining Middle School was the first school to be opened on the site and is currently under construction. The work of the Middle School Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. Some of the work required of the High School Contractor will take place within the Middle School site. Some of the work required of the Campus Site Contractor will take place within the High School site. The High School Contractor shall work with the Campus Site Contractor and Middle School Contractor to coordinate all work matters. This project involves the construction of a new high school, athletic fields, bus maintenance / diesel tech building and bus storage lot with fueling station. All buildings are Type II non-combustible construction. Veneers are predominantly brick with painted CMU interior wall construction. The school has a gymnasium, theater, kitchen, cafeteria and assorted classrooms. The bus maintenance and diesel tech building contains both classrooms and vehicle maintenance areas, as well as parts storage areas. Kirkwood High School is the second school to be built in a three-school campus. The high school site totals 67.74 acres and is a portion of the overall 114-acre campus site. A Campus Site package is currently under construction. The Campus Site package includes mass grading of the entire campus, construction of campus roadways, storm drainage, and utility (water, sewer, gas, electric) infrastructure. The work of the Campus Site Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. The adjoining Middle School was the first school to be opened on the site and is currently under construction. The work of the Middle School Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. Some of the work required of the High School Contractor will take place within the Middle School site. Some of the work required of the Campus Site Contractor will take place within the High School site. The High School Contractor shall work with the Campus Site Contractor and Middle School Contractor to coordinate all work matters. **NOTE -Addendum 2, Pg. 2, item III-2 lists 6 additional unit prices. These 6 items have been added to the attached Unit Price section (012700-Unit Prices - 24hrs After Bid.pdf), which is to be completed & submitted by the apparent low bidder only within 24 hours of bid opening. In addition, disregard the Compliance Statement on pg. 18 in Section 12 35 53.19 - Wood Laboratory Casework; it does not have to be turned in with your bid.
Award
Educational
$84,102,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 23, 2021
January 24, 2022
2702 Rossview Rd, Clarksville, TN
Related To This Project
Clarksville, TN
Bid Date: Jun 27 2019
Clarksville, TN
Bid Date: Sep 10 2025
Clarksville, TN
Bid Date: Sep 15 2025
Clarksville, TN
Bid Date: Sep 18 2025
Clarksville, TN
Bid Date: Oct 02 2025
Clarksville, TN
Bid Date: Sep 30 2025
Clarksville, TN
Bid Date: Oct 10 2025
Clarksville, TN
Bid Date: Nov 05 2025
Clarksville, TN
Bid Date: Aug 29 2025
Clarksville, TN
--
Clarksville, TN
Bid Date: Sep 03 2025
Clarksville, TN
Bid Date: Aug 08 2025
Clarksville, TN
Bid Date: Aug 05 2025
Clarksville, TN
Bid Date: Aug 13 2025
Clarksville, TN
Bid Date: Aug 05 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.