Published December 8, 2021 at 7:00 PM

Updated August 21, 2025

Site work and new construction of an educational facility in Clarksville, Tennessee. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

**As of December 7, 2021, project was awarded to RG Anderson Company for $84,102,000.00. The project start sometime in January 2022 and will be completed on the end of June 2023. Project no: 1345, 2021-122 Project Location: 2702 Rossview Road, Clarksville TN 37040 beside Kirkwood Middle School. Kirkwood High School is the second school to be built in a three-school campus. The high school site totals 67.74 acres and is a portion of the overall 114-acre campus site. A Campus Site package is currently under construction. The Campus Site package includes mass grading of the entire campus, construction of campus roadways, storm drainage, and utility (water, sewer, gas, electric) infrastructure. The work of the Campus Site Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. The adjoining Middle School was the first school to be opened on the site and is currently under construction. The work of the Middle School Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. Some of the work required of the High School Contractor will take place within the Middle School site. Some of the work required of the Campus Site Contractor will take place within the High School site. The High School Contractor shall work with the Campus Site Contractor and Middle School Contractor to coordinate all work matters. This project involves the construction of a new high school, athletic fields, bus maintenance / diesel tech building and bus storage lot with fueling station. All buildings are Type II non-combustible construction. Veneers are predominantly brick with painted CMU interior wall construction. The school has a gymnasium, theater, kitchen, cafeteria and assorted classrooms. The bus maintenance and diesel tech building contains both classrooms and vehicle maintenance areas, as well as parts storage areas. Kirkwood High School is the second school to be built in a three-school campus. The high school site totals 67.74 acres and is a portion of the overall 114-acre campus site. A Campus Site package is currently under construction. The Campus Site package includes mass grading of the entire campus, construction of campus roadways, storm drainage, and utility (water, sewer, gas, electric) infrastructure. The work of the Campus Site Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. The adjoining Middle School was the first school to be opened on the site and is currently under construction. The work of the Middle School Contractor is shown on the site plans for reference and is generally shaded or depicted in a different color from the work required of the High School Contractor. Some of the work required of the High School Contractor will take place within the Middle School site. Some of the work required of the Campus Site Contractor will take place within the High School site. The High School Contractor shall work with the Campus Site Contractor and Middle School Contractor to coordinate all work matters. **NOTE -Addendum 2, Pg. 2, item III-2 lists 6 additional unit prices. These 6 items have been added to the attached Unit Price section (012700-Unit Prices - 24hrs After Bid.pdf), which is to be completed & submitted by the apparent low bidder only within 24 hours of bid opening. In addition, disregard the Compliance Statement on pg. 18 in Section 12 35 53.19 - Wood Laboratory Casework; it does not have to be turned in with your bid.

Award

Educational

$84,102,000.00

Public - County

New Construction, Site Work

408

35

821

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
68
Bidding Soon
1,124
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2021

January 24, 2022

Project location map

2702 Rossview Rd, Clarksville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.