BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in San Luis Obispo, California. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

The Fremont Hillside Restoration and Stabilization Project is a Collaborative Design Build (CDB) Project with Schnabel Geostructural, Design and Construction serving as the Design-Builder. The bid is a continuation of an existing project currently in progress and is located in San Luis Obispo, California, on the Cal Poly SLO Campus as shown on the plans. A landslide created an area of instability which poses a risk to structure/s near the slide, and must be stabilized in order to allow occupancy of the structure/s. Schnabel has been awarded a Design-Build contract to stabilize the area as the General Contractor. Schnabel is requesting cost proposals from qualified subcontractors for the following scope of work: Provide earthwork, concrete, riprap, revegetation, and landscaping services to Schnabel to stabilize the area in accordance with the plans and specifications. Specifically, the bid packages will be: 3. Final Erosion Control 4a. Stormwater and Drainage - Concrete Interceptor Swale 4b. Stormwater and Drainage - Rip-Rap Swale 5. Landscape, Courtyard Improvements, & Concrete Hardscape The work is to be completed on a schedule to facilitate the prompt reopening of the adjacent Fremont Hall. Subcontractor will be required to provide acknowledgement of the schedule and will be required to commit the necessary resources to meet the project schedule demands. A bid guarantee will be required from each bidder. Performance and Payment bonds may be required. The RFP includes a line item in the bid tab for the payment and performance cost. Bonds must be in place prior to beginning work. Requests for information (RFI) will be accepted up to 5 working days prior to the bid at which time no further questions will be acknowledged. A final addendum answering all questions will be sent to all confirmed bidders no later than 48 hours prior to the bid date/time. Schnabel Contact Info: Doug Jenevein (925) 947-1881 EMAIL:fremont-sp6103@schnabel.com

Post-Bid

Sidewalks / Parking Lot

$610,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
222
All Active Projects
99
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

August 3, 2022

img_map_placeholder

1 Grand Ave, San Luis Obispo, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.