Site work and paving for a road / highway in Cairo, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

FEDERAL PROJECT NUMBER(S): FAF 24-2(49),FAS-S202(064), FAS-S202(065) (1): Job J2P3248 Route 24 RANDOLPH County. Resurface and add shoulder from 0.9 mile east of Route 63 to the Monroe County line near Milton, the total length of improvement being 5.848 miles. (2): Job J2S3337 Route Z RANDOLPH County. Resurface from Route DD to Route 63 near Cairo, the total length of improvement being 3.3 miles. (3): Job J2S3340 Route PP MACON County. Resurface from Route 63 to Route V near Macon, the total length of improvement being 7.612 miles. Range: $1M to $2.5M Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - B03 - Resurface and Add Shoulder, Resurface *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,574,337.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Cast-in-Place Concrete Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
34
Bidding Soon
567
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

March 7, 2022

img_map_placeholder

Multiple Locations, Cairo, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.