BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2022 at 7:00 PM

Updated October 24, 2023

Demolition, site work and new construction of a civil project in Wanamingo, Minnesota. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Registering as a Planholder is recommended for all prime Contractors and subcontractors as Planholders will receive automatic notice of addenda and other contract document updates via QuestCDN. Contact QuestCDN Customer Support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading digital project information and vBid online bid submittal questions. For this project, bids will ONLY be received and accepted via the online electronic bid service through. To access the electronic bid form, download the project documents and click on the online bid button at the top of the bid advertisement page. Prospective bidders must be on the Planholder list through QuestCDN for bids to be accepted. Water Storage Tank, Elevated - Ground Storage Tanks, Water Utilities, Water and Wastewater Facilities, Fire Hydrant, Water/Wastewater Infrastructure, Waterlines. Construction of a 250,000 gallon single pedestal elevated water storage tank, demolition of two existing water storage towers, site work and grading, miscellaneous electrical, piping and fixtures, along with other related work. The extent of the work involved is furnishing all labor and materials for construction of the Cenex Water Tower together with related subsidiary and incidental work including: Construction of a single pedestal elevated water storage tank, demolition of two existing water storage towers, site work and grading, miscellaneous electrical, piping and fixtures, along with other related work. The work to be performed under these specifications includes removal of the existing Downtown 50,000-gallon, multi-legged, elevated steel water tower, and the Mingo View 137,000-gallon standpipe. Both removals shall include foundations, piping, valves and appurtenances. Contractor shall provide labor, equipment and supervision required to demolish the existing structures in accordance with all applicable EPA and ANSI/OSHA rules and regulations. The existing Downtown tower is located on the NE corner of the intersection of Main St. and 5 th St. E at Larson Log House Park, and the existing Mingo View standpipe is located at on the east side of Mingo View Dr. just south of 440 th St.

Award

Water / Sewer

$1,268,000.00

Public - City

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
161
Bidding Soon
1,563
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

February 7, 2022

Project location map

To Be Determined, Wanamingo, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.