Published January 21, 2022 at 7:00 PM

Updated September 14, 2023

Demolition, site work, renovation and addition to a detention facility in Kuna, Idaho. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.

Bid Package 2 All Other Work (MEP, Interior Construction, Drywall, Painting, Siding, and Finishes, etc) THIS PROJECT IS A DESIGN-BUILD DELIVERY OF A 152 -BED CAPACITY INMATE WORKER FACILITY. IT IS A TWO-STORY BUILDING WITH ADA ACCESS ON THE FIRST FLOOR ONLY. THE BUILDING IS ARRANGED IN 4 TIERS WITH QUAD SLEEPING ROOMS THROUGHOUT. EACH TIER HAS A DAYROOM AND ASSOCIATED RESTROOMS. THE PROGRAM IS A STEPPED OR LEVEL PROGRAM WITH GREATER AMENITIES PROVIDED FOR THE FIRST-FLOOR TIERS OVER THE SECOND-FLOOR TIERS INCLUDING LAUNDRY AND KITCHENETTE THE FACILITY IS MEANT TO PREPARE RESIDENTS FOR REENTRY BY PROVIDING A MORE NORMATIVE ENVIRONMENT AND OPPORTUNITIES FOR INDEPENDENT LIVING SKILLS TRAINING. AMENITIES, PROGRAMS, AND DESIGN ARE INCLUDED TO EMULATE THE RESTORATIVE JUSTICE PHILOSOPHY OF THE IDAHO DEPARTMENT OF CORRECTION. COLOR, GRAPHICS, AND ACOUSTICS ARE IMPORTANT TO THE CLIENT TO PROVIDE A NORMATIVE ENVIRONMENT FOR RESIDENTS. RESIDENTS WILL HAVE THE FREEDOM TO MOVE THROUGHOUT THE DORMITORY AND INTO OTHER TIERS/DAYROOMS MOST OF THE TIME. THERE IS THE ABILITY TO LOCK THE DORMITORY DOWN INTO FOUR TIERS SHOULD AN EVENT OCCUR. RESIDENTS DO NOT LEAVE CAMPUS TO WORK IN THE COMMUNITY 1. Design and construct a new 152 Bed minimum security prison dormitory within the existing secure perimeter and other Work indicated in the Contract Documents. Removal of existing modular buildings by Owner. 2. See Drawings for code references. Addendum A, B and C have been released. Construction began on November 9, 2021 with mobilization. Utilities followed on November 18, 2021. Site work is scheduled to start on December 23, 2021 and structure construction will begin on March 18, 2022.

Under Construction

Jails / Prisons

$11,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
28
Bidding Soon
311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.