BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Great Falls, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of December 27, 2021 the project was awarded to United Materials of Great Falls, Inc. with award amount of $659,354.86** The Montana Department of Transportation (MDT) is accepting bids for Chip Seal / Scrub Seal Vaughn to Dutton Great Falls Area. Question Submission Close Date 12/2/2021 2:00 PM MST Contractor shall provide all labor, equipment, materials, incidentals, and traffic control necessary to produce, haul, place, roll and broom approximately 182,424 square yards of laid-in-place chip seal. The chip seal will be approximately 12.1 miles long and 26 feet wide. Contractor shall provide CRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. Contractor must provide enough pilot cars to keep traffic stops to a maximum of 15 minutes. The emulsion application rate for chip seals is estimated at.41 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. Immediately after sweeping Contractor shall provide CSS-1H asphalt emulsion diluted at a ratio of 60% oil and 40% water diluted at the supplier. Apply the fog seal at an estimated application rate of 0.15 gallons per square yard using a #4 nozzle. If the application rate is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. All traffic must be kept off the fog seal until it has cured sufficiently to prevent traffic from tracking the emulsion as determined by the Project Manager. This time is estimated to be approximately 45 to 60 minutes. The Department will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above SPECIFICATIONS FOR WORK: SCRUB/FOG SEAL PORTION, MILEPOST: 12.1 - 18.7 Contractor shall provide all labor, equipment, materials, incidentals, and traffic control necessary to produce, haul, place, roll and broom approximately 100,672 square yards of laid-in-place scrub seal. The scrub seal will be approximately 6.6 miles long and 26 feet wide. Contractor shall provide PMRE (Polymer Modified rejuvenating Emulsion) and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. Contractor must provide enough pilot cars to keep traffic stops to a maximum of 15 minutes. Prior to emulsion application, Contractor must ensure roadway is clean and free of debris. All cracks must be dry and blown free of debris to allow emulsion to adhere to the existing crack walls. The emulsion application rate for scrub seals is estimated at .45 gallons per square yard. Following application of the emulsion, use a scrub broom to force the emulsion into the existing surface. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the scrub design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the scrub seal. Immediately after sweeping Contractor shall provide CSS-1H asphalt emulsion diluted at a ratio of 60% oil and 40% water diluted at the supplier. Apply the fog seal at an estimated application rate of 0.15 gallons per square yard using a #4 nozzle. If the application rate is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. All traffic must be kept off the fog seal until it has cured sufficiently to prevent traffic from tracking the emulsion as determined by the Project Manager. This time is estimated to be approximately 45 to 60 minutes. The Department will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above. For the purposes of this contract, this location is deemed Zone 1 due to the proximity to the major urban area of Great Falls, MT.

Award

Roads / Highways

$659,355.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
6
Bidding Soon
40
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

January 6, 2022

img_map_placeholder

Multiple Locations, Great Falls, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.