Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Great Falls, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of December 27, 2021 the project was awarded to United Materials of Great Falls, Inc. with award amount of $101,090.40** The Montana Department of Transportation (MDT) is accepting bids for Chip Seal E Frontage Road SE of Dutton Airport Great Falls Area. Questions or information relating to either specifications or requirements of this Invitation for Bid shall be asked through Electronically Be sure to certify and submit your bid response once completed. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Contractor shall provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, roll and broom approximately 38,016 square yards of laid-in-place chip seal. The chip seal will be approximately 2.7 miles long and 24 feet wide. Contractor shall provide CRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. Contractor must provide enough pilot cars to keep traffic stops to a maximum of 15 minutes. The emulsion application rate for chip seals is estimated at .41 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. Immediately after sweeping Contractor shall provide CSS-1H asphalt emulsion diluted at a ratio of 60% oil and 40% water diluted at the supplier. Apply the fog seal at an estimated application rate of 0.15 gallons per square yard using a #4 nozzle. If the application rate is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. All traffic must be kept off of the fog seal until it has cured sufficiently to prevent traffic from tracking the emulsion as determined by the Project Manager. This time is estimated to be approximately 45 to 60 minutes. The Department will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above
Award
Roads / Highways
$101,090.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2021
January 5, 2022
Multiple Locations, Great Falls, MT
Related To This Project
Great Falls, MT
Bid Date: Mar 31 2022
Great Falls, MT
Bid Date: Mar 02 2022
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
--
Great Falls, MT
Bid Date: Jan 26 2022
Great Falls, MT
Bid Date: Nov 17 2021
Great Falls, MT
Bid Date: Mar 07 2022
Great Falls, MT
Bid Date: Mar 10 2022
Great Falls, MT
Bid Date: Feb 24 2022
Great Falls, MT
Bid Date: Feb 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.