EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2022 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in East Pennsboro, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

This Project Consists of Milling, Base Replacement, Concrete Pavement Patching, Minor Drainage, Ada Ramps, Paving, Cavc Site Repair and Other Miscellaneous Construction, All as Indicated on the Approved Drawings Included in the Bid Package for Interstate 81, Section 087, in Cumberland County, Silver Spring Township, From Rich Valley Road (SR 1009) at Segment 0550 Offset 0550 (Nb) to the Conodoguinet Creek at Segment 0554 Offset 0784 (Nb), 1,680.00 Linear Feet (0.318 Mile) and Rich Valley Road (SR 1009) at Segment 0551 Offset 0550 (Sb) to the Conodoguinet Creek at Segment 0555 Offset 0723 (Sb), 1,174.00 Linear Feet (0.222 Mile) and in Cumberland County, Hampden Township From Lambs Gap Road at Segment 0584 Offset 1471 (Nb) to Cumberland County, East Pennsboro Township at SR 11 & 15 at Segment 0650 Offset 0015 (Nb), 32,435 Linear Feet (6.14 Miles)and in Cumberland County, Hampden Township From Lambs Gap Road at Segment 0585 Offset 1439 (Sb) to Cumberland County, East Pennsboro Township at SR 11 & 15 at Segment 0651 Offset 0015 (Sb), 32,556 Linear Feet (6.17 Miles), for an Overall Project Length of 67,845 Linear Feet (12.85 Miles). Also in Dauphin County, Susquehanna Township From SR 11 &15 at Segment 0650 Offset 0016 (Nb) to George Wade Bridge at Segment 0650 Offset 0878 (Nb) and in Dauphin County, Susquehanna Township From SR 11 & 15 at Segment 0651 Offset 0016 (Sb) to George Wade Bridge at Segment 0651 Offset 0874 (Nb). Project Cost Range: $20,000,000.00 - $24,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Anticipated NTP: 01/31/2022 Required Completion: 11/21/2023 All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - I-81 Resurfacing Exit 59 to Wade Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$21,796,022.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
89
Bidding Soon
1,324
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 31, 2022

img_map_placeholder

I-81, East Pennsboro, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

I-81 Resurfacing Exit 59 to Wade Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.