BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Manor, Texas. Completed plans call for the renovation of a educational facility.

Project no -P2120900BE construction services for the Roof Repair/Replacement Project ("the Project"), as specifically set forth in the CSP package and pursuant to Texas Government All CSPs must be proposed on a lump sum basis including general contract, electrical, plumbing and mechanical work. The Project will generally include Districtwide Campus Roof Repair and/or Replacements at the following Manor Independent School District Campuses: 1. Oak Meadow Elementary School located at 5600 Decker Lane, Austin, Texas 78724 2. Blake Manor Elementary School located at 18010 Blake Manor Rd, Manor, TX 78653 3. Decker Middle School located at 8104 Decker Ln, Austin, TX 78724 4. Manor High School located at 12700 Gregg Manor Rd, Manor, TX 78653 5. Central Administration Building located at 10335 US Hwy 290E., Manor, TX 78653 6. Manor New Tech High School located at 10323 U.S. Hwy 290 E., Manor, TX 78653 7. Manor Middle School located at12900 Gregg Manor Rd., Manor, TX 78653 In addition, coordination between the roof repair and/or replacement project and the districtwide campus HVAC project will be required to the extent the projects overlap, including but not limited to scheduling, materials, roof connection, etc. Districtwide Campus Roof Repair and Replacement. 1. Campuses: a. Oak Meadows Elementary School: 5600 Decker Ln., Austin, TX 78724 i. Install new architectural standing seam metal roof and insulation overlay over existing metal roof system. ii. Paint existing metal roofs to match new color. b. Blake Manor Elementary School: 18010 Blake Manor Rd., Manor, TX 78653 i. Install new two-ply modified bitumen and insulation on existing steel roof deck. Remove and replace existing built up roof system with gravel cover. c. Decker Middle School: 8104 Decker Ln. Austin, TX 78724 i. Install new architectural standing seam metal roof and insulation overlay over existing metal roof system. ii. Install new two-ply modified bitumen and insulation on existing steel roof deck. Remove and replace existing built up roof system with gravel cover. d. Manor High School: 12700 Gregg Manor Rd. Manor, TX 78653 i. Install new architectural standing seam metal roof and insulation overlay over existing metal roof system. ii. Paint existing metal roofs to match new color. e. Manor Middle School: 12900 Gregg Manor Rd. Manor, TX 78653 i. Install new two-ply modified bitumen and insulation on existing steel roof deck. Remove and replace existing built up roof system with gravel cover. f. Manor New Tech High School: 10323 U.S. Hwy 290 E. Manor, TX 78653 i. Install new architectural standing seam metal roof and insulation overlay over existing metal roof system. g. Central Administration Building: 10335 U.S. Hwy 290E, Manor, TX 78653 i. Install new two-ply modified bitumen and insulation on existing steel roof deck. Remove and replace existing modified bitumen roof system with gravel cover.

Award

Educational

$5,946,000.00

Public - City

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
148
Bidding Soon
3,789
All Active Projects
1,482
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 17, 2021

January 17, 2022

img_map_placeholder

Multiple Locations, Manor, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.