Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a stadium in Midland, Texas. Completed plans call for the renovation of a stadium.
As of 4/7/2022 project was not yet been awarded. No estimated time frame yet. Audio Visual Equipment Replacement at Grande Communications Stadium . Offerors may use this time to view the site in person to provide accuracy to submitted proposals. Offerors must confirm attendance by contacting the City representative,Kiara Taylor, at 432-685-7501 or by email at ktaylor@midlandtexas.gov by Wednesday,November 24, 2021. The City of Midland desires to modernizes the audio and visual equipment for Grande Communications Stadium with the latest audio and visual technology. The City of Midland is looking for a vendor to provide professional services that include but are not limited to updating fiber and cabling, replacing out-of-date sound equipment, replacing field cameras, and updating the PA system. This effort will enhance quality and effectiveness of the venue for both the City of Midland and other contracted users. The functional objective of this RFP is to complete the following tasks, included but not limited to (Please see attached blueprints): 1. Replace Sound equipment (UPS must be included in replacement) 2. Cable TV network connection 3. Replace cameras and install receivers on field a. 50-yard cam b. Goal and End zone cams c. Pole cameras 4. Fiber a. Camera receivers b. Sound c. Scoreboard 5. Cabling a. Scoreboard 6. PA System a. Should be available in the following areas (Home and Visitors) : i. Concessions ii. Bleachers iii. Bathrooms iv. Locker rooms v. 3 rd floor Suites 7. Junction Box for Outside Users 8. Wireless Microphones 9. Headsets (Minimum of 3) 10. TVs for Concession area (View schematics for placement) 11. TVs installation for Suites 12. Wi-Fi a. Public Use b. Coach Quarters c. Locker Rooms d. Suites 13. Firewall 14. Radio Rooms a. 2 internet drops per room 15. Electrical Outlets in all rooms 16. Training Costs 17. Support and Maintenance Costs
Post-Bid
Arenas / Stadiums
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2022
March 30, 2022
801 N Loop 250 W, Midland, TX
Related To This Project
Midland, TX
--
Midland, TX
--
Midland, TX
Bid Date: Feb 04 2021
Midland, TX
Bid Date: Apr 07 2021
Midland, TX
Bid Date: Jan 08 2021
Midland, TX
--
Midland, TX
Bid Date: Jul 21 2021
Midland, TX
Bid Date: Mar 16 2022
Midland, TX
Bid Date: Mar 22 2022
Midland, TX
Bid Date: Nov 08 2019
Midland, TX
--
Midland, TX
Bid Date: Sep 04 2019
Midland, TX
Bid Date: Mar 06 2019
Midland, TX
Bid Date: Apr 18 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.