BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2021 at 7:00 PM

Updated April 11, 2024

Site work and paving for a mixed-use development in Penbrook, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work will include, but not necessarily be limited to, the removal and installation of storm pipe, inlets, concrete curb, and sidewalk, and other work specified in the contract. Project consists of the removal and installation of storm pipe, storm structures, and curb and sidewalk. Project location: Intersection of N. 28th Street and Ludwig Alley1. Mobilization and demobilization including bonds and insurances (1 LS) 2. Work zone traffic control (1 LS) 3. Type M inlet, including removal of existing inlet, complete in-place (5 EA) 4. 12" SLCPP, including removal of existing pipe, complete in-place (29 LF) 5. 18" SLCPP, including removal of existing pipe, complete in-place (27 LF) 6. 24" SLCPP, including removal of existing pipe, complete in-place (12 LF) 7. Concrete curb, including removal of existing curb, complete in-place (88 LF) 8. Concrete sidewalk, including removal of existing sidewalk and lawn restoration, complete in-place (450 SF) 9. Detectable warning surface, complete in-place (32 SF) 10. Concrete step, complete in-place (1 EA) 11. Mill pavement outside of trench restoration, 1.5" depth (40 SY) 12. Superpave asphalt mixture design wearing course, 9.5mm, PG 64S-22, 0 to 0.3 million ESALs, SRL-L, 1.5" depth, complete in-place (10 TON) A certified check or bid bond for the amount of ten percent of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. Only those questions submitted online via PennBID shall be considered. Questions received after 5:00 PM on December 6, 2021 regarding the project will not be acknowledged. This contract is subject to the following: PA Prevailing Wage Rates; the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, also known as the Underground Utility Line Protection Law, Act 287 of 1974, as amended; the Pennsylvania Human Relations Act 222 Conditions; the Non-discrimination in Employment/Contract Compliance Regulations Conditions; requirement of a non-collusion affidavit; and the Public Works Employment Verification Act. Penbrook Borough Storm Water Authority reserves the right to accept or reject any or all Bids. Completion-May 6, 2022

Bid Results

Water / Sewer

$77,254.00

Public - City

Paving, Site Work

12

11

2

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
189
Bidding Soon
2,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 10, 2022

Project location map

Ludwig St & N 28th St, Penbrook, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.