BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Savage, Maryland. Completed plans call for the renovation of a water / sewer project.

Howard County intends to procure the services of a construction firm to replace Motor Control Center 5 (MCC-5) and relocate equipment loads at Little Patuxent Water Reclamation Plant. The scope of work consists of furnishing of all materials and labor for the construction of, complete in place, demolishing the existing MCC-5, replacing with new MCC-5, transferring equipment loads and controls, miscellaneous appurtenances and incidental items of work. 1. The furnishing of all material and the construction required for the new / replacement MCC-05 with new electrical gear, conduits, feeders, motor controls, miscellaneous appurtenances and incidental items of work. 2. The furnishing of all material and the construction required for all indicated ATS units, transformers, and panel boards with new conduits, feeders, miscellaneous appurtenances and incidental items of work. 3. Provide housekeeping pad modifications for MCC-05 and provide supports for wall-mounted transformers as well as ATS units and panel boards 4. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-06 to Panel boards PJ and PR, including conduits and feeders. Loads consist of RAS Pumps 16, 17, and 18 and incidental items of work. 5. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-06 to MCC-05, including conduits and feeders. Loads consist of FC-3 collector arm, FC-3 scum pump and West Pipe Gallery splitter sump pump and incidental items of work. 6. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-05 to MCC-22, including conduits and feeders. Loads consist of PC-3 collector arm and PC-4 collector arm and incidental items of work. 7. The furnishing of all material and construction required for the installation of new disconnect switches, local control panel, and associated conduit and wiring for existing scum pumps at Final Clarifiers FC-3, FC-4 and FC-5 and incidental items of work. 8. The furnishing of all material and construction required for the replacement of existing disconnect switches, and addition a new local control panel, and associated conduit and wiring at existing Primary Clarifiers PC-3, and PC-4 for the collector arm and incidental items of work. 9. Provide miscellaneous instrumentation upgrades and testing at field laboratory building. Testing shall include I/O checkout, loop, and SCADA testing. 10. The furnishing of all material and the construction required for the installation of new ventilation system, including fans, ducts, dampers, supports, and miscellaneous appurtenances and incidental items of work. All proposed work shall be completed within 120 calendar days from notice to proceed MBE Participation (%) 15.0 Each bid submission shall be accompanied by an electronic copy of bid bond OR certified check. The bid deposit shall be 5% of the total bid, made payable to "Director of Finance, Howard County". A performance bond and payment bond for the full amount of the contract price shall be required of the successful bidder within 10 days after award notification. Said bond shall be issued by a surety company subject to approval of Howard County. Q&A Deadline 03/08/2022 4:00 PM (EST) Liquidated Damages $500.00 Per Calendar Day

Award

Water / Sewer

$1,915,336.00

Public - County

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
80
Bidding Soon
2,168
All Active Projects
913
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

May 30, 2022

img_map_placeholder

To Be Determined, Savage, MD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.