BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Huntington Beach, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Install fiber optic conduit and cable along Gothard Street between Edinger Avenue and Warner Avenue. Project provides improved communication resilience between City Hall and the northerly part of the City including the City Yard and the traffic signals in the area. PROJECT NEED: This is needed to improve connectivity between City Hall and other City facilities and traffic signals to the north. This segment improves redundancy which will maintain communications in case of a single break in the cable. Project is included in the City of Huntington Beach FY 2021-2025 CIP. As of January 4, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2022/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$606,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
662
Active Projects
283
Bidding Soon
3,736
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

Project location map

Gothard St, Huntington Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.