BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2021 at 7:00 PM

Updated November 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Oxford, Pennsylvania. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

The work shall consist of constructing curb, sidewalk, pavement milling and bituminous overlay, minor storm sewer improvements and street lights along portions of Octoraro Alley, Locust, Coach and South Second Streets; curb, sidewalk, concrete pavers, minor storm sewer improvements and landscape amenities along a portion of Octoraro Alley; major storm sewer improvements and reconstruction of North Second Street; and other related items. Subcontractors for excavation, paving, storm sewer, curb, sidewalk and pavement marking construction are required to be PennDOT pre-qualified for the items of work they will perform and are required to be a PennDOT business partner. The project is subject to the requirements of the Pennsylvania Prevailing Wage Act. Funding for the project is being provided through County and State grants. Work shall be performed in accordance with all grant guidelines, including nondiscrimination and prevailing wage requirements. Additional compliance requirements may apply; the OWNER retains the right to enforce said additional requirements. Attention is called to the fact that no less than the minimum salaries and wages as set forth in the contract documents must be paid, and that employees shall not be discriminated against because of their race, color, religion, sex, or national origin. ach Bid shall be accompanied by a Bid Security in the amount of ten percent (10%) of the total amount of the Bid. Proposals shall be effective for sixty (60) calendar days from the date of opening. The successful bidder shall be substantially complete the Octoraro Alley Pedestrian Area portion of the WORK by May 12, 2022, the Coach Street portion of the WORK by June 2, 2022 and shall substantially complete the entire project by July 27, 2022. The successful bidder will be required to pay a fee to PennBID a fee. The Borough of Oxford reserves the right to accept or reject any or all Proposals or portions thereof. Pauline Garcia-Allen, Manager Borough of Oxford DLN Clarification Deadline: 12/9/2021 5:00 PM Bidder agrees that all components of Item A will be substantially complete by May 12, 2022 as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment by May 27, 2022, that all components of Item D will be substantially complete by June 2, 2022 as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment by June 17, 2022, and that the remainder of the Work will be substantially complete by July 27, 2022 as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment by August 26, 2022. The anticipated Notice to Proceed Date is on or about January 17, 2022

Award

Sidewalks / Parking Lot

$1,284,294.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
264
Bidding Soon
4,150
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

February 17, 2022

Project location map

Multiple Locations, Oxford, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.