BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 6, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a mixed-use development in East Irvine, California. Completed plans call for the renovation of a educational facility.

The proposed space at Student Center will be the renovation of the Crystal Cove Auditorium (CCA) includes new floor finishes, acoustical panels, T-bar ceiling, and lighting, and mechanical alterations, a new ADA platform seating area, and limited renovation in the projection room. The work will require for CCA air handling unit to provide a single variable frequency drive (VFD) for two existing return fans and replacement of two return fan motors and associated controls and electrical work. The roofing scope of work requires full replacement of the existing roof system for Student Center Buildings A and B including demolition down to the concrete roof deck, installation of the roof membrane, insulation, flashing, roof drains, expansion joints, roof hatch and roof ladders. Solar panels on the Building B roof will remain in place and operable during the work. Contractor shall be responsible for ensuring new work and building interiors are not damaged as a result of inclement weather. Project to provide training for up to five Student Center employees on how to repair single-ply membrane roofing to maintain manufacturers extended warranty. The roof work will require coordination with Student Center staff to replace roof receptors, overflow, and roof drain piping on the underside of the roof deck, including interior patching and repair of associated interior ceiling finishes. Interior roof drain work shall be scheduled for off hours, nights, or weekends, and scheduled a minimum of 10 work days in advance with the Universitys Representative. Refer to 02 4119, Selective Demolition for temporary protection. The work includes the replacement of evaporator units at the Catering Kitchens walk-in coolers and freezer located on the second floor, installation of new refrigeration condensing units on a new concrete pad located on the Building A roof, and complete replacement of refrigeration piping. Refrigerant shall be evacuated and recycled in accordance with specification 02 4119, Selective Demolition. The following General Contractors have been prequalified to submit sealed bids on this project: 2H CONSTRUCTION, INC. Signal Hill, CA 90755 ALIGN BUILDERS, INC. Carlsbad, CA 92008 RED POINTE ROOFING, LP Orange, CA 92868 The successful Contractor will be required to have the following California contractors license active at the time of submission of the Bid: B, GENERAL BUILDING AND C-39 ROOFING LICENSE CLASS REQUIRED: B, General Building and C-39 Roofing For further information contact Rosa Hernandez, Contracts Analyst at (949) 824-6221 or rosaeh@uci.edu. PROJECT DURATION: Three Hundred and Twenty-Three (323) Calendar Days

Award

Educational

$5,481,848.00

Public - State/Provincial

Renovation

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

May 10, 2022

Project location map

To Be Determined, East Irvine, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.