Published January 20, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Girard, Pennsylvania. Completed plans call for the renovation of a educational facility.

The low bidders for this project have been awarded and are as follows: General Construction: Perry Construction Group Inc. HVAC Construction: Scobell Company, Inc. Electrical Construction: Church & Murdock Electric Inc. Plumbing Construction: Rabe Enviromental Systems, Inc. The Girard School District is currently requesting proposals for the renovations to the Girard High School. This project includes the upgrade of ceilings, lighting, HVAC equipment, etc. throughout various areas of the building. Renovation work to the Girard High School, 1135 Lake Street, Girard, PA 16417 Each bid shall include the following 1. Completed Bid Form 2. Certified check, a cashiers check or the bid bond of an approved Surety Company, in an amount of not less than ten percent of the amount of the proposal. Check or bond shall be drawn in favor of the Girard School District. 3. Completed Non-Collusion Affidavit 4. Completed Byrd Anti-Lobbying Amendment Form(s) 5. Completed Public Works Employment Verification Form(s) No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. The Contractors attention is specifically directed to the fact that the anticipated starting date of work will not be before April 18, 2022 (Boiler Room work only) and June 13, 2022 for the remainder of the work. The Contractor shall state in his Bid Form, the exact number of working days required to fully and finally complete the work. Work shall be started on the project not later than ten (10) days after notification by the Owner or Engineer to start work. The entire work shall be completed, ready for use, on or before August 19, 2022. The Owner reserves the right to waive any informalities in bids, or to reject any or all bids. Specifications and drawings that are requested by the Contractor to be shipped, will be sent via UPS Ground upon receipt of an additional ten ($10.00) dollar non-refundable shipping fee.

Award

Educational

$250,000.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Tile Ceilings, Flooring, Access Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies, Storage Racks
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Equipment Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, HVAC Gravity Ventilators, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Indoor Central-Station Air-Handling Units, Modular Indoor Central-Station Air-Handling Units, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution, Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Material Storage, Storage Equipment and Systems, Storage Racks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
67
Bidding Soon
963
All Active Projects
440
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2022

April 18, 2022

img_map_placeholder

1135 Lake St, Girard, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Girard Area School District Girard High School Renovations Specifications Volume 1 of 2 RE-BID

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.