BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Mateo, California. Completed plans call for the renovation of a educational facility.

The replacement of existing HVAC equipment within the identified campus facilities as well as primary and secondary electrical system upgrades on various campuses, listed as follows, Abbott Middle School, 600 36thAvenue, San Mateo, California George Hall Elementary School, 130 San Miguel Way, San Mateo, California Laurel Elementary School, 317 36th Avenue, San Mateo, California To bid on this Project, the Bidder is required to have been prequalified by the District. To bid on this Project, the Bidder is required to have been prequalified by the District. Project has electrical, mechanical, or plumbing components that will be performed by subcontractors performing under the following license classification(s), C-10, C-20, and C-36, then each of those subcontractors that intend to bid as a first-tier subcontractor to a general contractor (prime contractor) are required to have been prequalified by the District prequalification questionnaires will be received until 4:00 P.M., December 28, 2021 The replacement of existing HVAC equipment within the identified campus facilities as well as primary and secondary electrical system upgrades on various campuses, listed as follows, Abbott Middle School, 600 36th Avenue, San Mateo, California o Engineer's estimated construction value for this work is $4,800,685.00 George Hall Elementary School, 130 San Miguel Way, San Mateo, California o Engineer's estimated construction value for this work is $3,873,774.00 Laurel Elementary School, 317 36th Avenue, San Mateo, California o Engineer's estimated construction value for this work is $3,756,664.00 Combined total Engineer's estimated construction value for Bid Package #1 is $12,431,123.00 As security for its Bid, each bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. 10. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. All prequalification questionnaires will be received until 4:00 P.M., December 28, 2021 The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received.

Award

Educational

$14,477,000.00

Public - City

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
169
Bidding Soon
3,176
All Active Projects
1,293
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 13, 2022

March 16, 2022

August 12, 2022

img_map_placeholder

Multiple Locations, San Mateo, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.