BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Mateo, California. Completed plans call for site work for a water / sewer project.

Such Each bid shall be made out on the Bid Proposal Form included in the contract documents and must conform and be fully responsive to this invitation, the plans and specifications and all other documents comprising the pertinent contract documents. The check or bid bond shall be given as a guarantee that the bidder to whom the contract is awarded shall execute the contract documents and shall provide the required payment and performance bonds and insurance certificates as specified therein within ten (10) days after the notification of the award of the contract. The successful bidder shall comply with the provisions of the Labor Code pertaining to payment of the generally prevailing rate of wages and to apprenticeship or other training programs. Pursuant to Section 15.a of the General Conditions applicable to the Project, the successful bidder shall comply with any applicable order of the federal government, the Governor of the State of California or the County of San Mateo Health Officer and implement "best management practices" for mitigating the risk of COVID-19 at the Project site. The Governing Board has obtained, from the Director of the Department of Industrial Relations, the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classifications or type of worker needed to execute the contract, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are on file at the District office and shall be made available to any interested party upon request and are also available online . It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under the contractor, to pay not less than the specified rates to all workers employed by them in the execution of the contract. It is the contractor's responsibility to determine any rate change which may have or will occur during the intervening period between each issuance of written rates by the Director of Industrial Relations. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work shall be at least time and one half. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with Public Contract Code Section 22300 is permitted. Performance and payment bonds will be required of the successful bidder. Pursuant to Public Contract Code section 4104 each bid must include the name and location of the place of business of each Subcontractor who shall perform work or service or fabricate or install work for the prior contactor of this contract in excess of one-half of one percent (1/2 of 1%) of the bid price. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening for bids except as provided pursuant to Public Contract Code Sections 5100 et seq. The District reserves the right to reject any and all bids and to waive any informalities or irregularities in the bidding. Minority, women, and disabled veteran contractors are encouraged to submit bids. This bid is not subject to Disabled Veteran Business Enterprise requirements.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
86
Bidding Soon
1,691
All Active Projects
643
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

March 17, 2022

img_map_placeholder

3115 Del Monte St, San Mateo, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.