EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

For 300232 North Campus Student Room Renovations Phase 3 North Campus Student Room Renovations Phase 3 - this is a continuation of student room asbestos abatement and finishes upgrade to student rooms in four residence halls in North Campus. The scope of work includes renovations in all student rooms in Hartford, Hurley, Baldwin and McConaughy Halls all located in North Campus. Renovations include removing all asbestos (which has been identified in floor tiles and concrete ceiling skim coating), installing new floor tiles, new skim coating on the ceilings, cleaning of window and window frame, painting, lighting and new pipe insulation. Also included is cleaning of stairwells, waxing corridor floors and insulation in corridor heating pipes. Project Schedule/Duration: The construction is planned to start: May 11th 2022 Construction duration: 90 Calendar days Financial Ability: The Contractor must demonstrate the financial ability and bonding capacity to complete a construction project with a minimum value of at least $3,500,000.00. contractors are advised that they must award thirty percent (30%) or more of the value of their awarded contract to certified SBEs and, of that amount, one-third (10% of the total award) or more must be awarded to SBEs who are also MBEs Question Submission Close Date February 3rd 2022 2:00PM

Award

Educational

$1,875,350.00

Public - City

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Temporary Controls, Temporary Environmental Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices, Flags and Banners, Banners
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
561
Active Projects
366
Bidding Soon
3,870
All Active Projects
1,803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

July 6, 2022

img_map_placeholder

To Be Determined, Storrs Mansfield, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

North Campus Student Room Renovations Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.