Published July 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Marion, Illinois. Completed plans call for the renovation of a medical facility.

Contract Award Date: Jun 08, 2022 Contract Award Number: 36C25522C0044 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: QYBLA45RZL74 Contractor Awarded Name: SMITH HAFELI, INC. Contractor Awarded Address: MARION, IL 62959 Base and All Options Value (Total Contract Value): $2967832.00000000 36C25522R0046_0002, 36C25522R0046-0003 36C25522R0046 CLH Project #2018-26 Project Title and No. Renovate Building 15, 657A5-18-111 Project Location: Marion VA Medical Center, 2401 W. Main St., Marion , Illinois 62959 Magnitude of Project: Between $2,000,000.00 and $5,000,000.00 (VAAR 836.204) Type Construction: General Building NAICS: 236220, General Construction Contractors SMALL BUSINESS SIZE: $39.5 Million PERFORMANCE PERIOD: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days. The time stated for completion shall include final cleanup of the premises. SITE VISIT: A site visit will be conducted on: February 14, 2022 at 10:00 AM CDT. Location: Building 15 Conference Room, Marion VA Medical Center, 2401 W. Main St., Marion, Illinois 659259 BID GUARANTEE A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish a photocopy of the original bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. Bidders shall provide an original bid guarantee within two business days after notification by the Contracting Officer. PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Protection (Bonds)(See Clause 52.228-13), and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award. METRIC PRODUCTS: Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch/pound units, providing they fall within the tolerances specified using conversion tables contained in the latest revision of Federal Standard No. 376B, and all other requirements of this document are met. If a product is manufactured to metric dimensions and those dimensions exceed the tolerances specified in the inch/pound units, a request should be made to the contracting officer to determine if the product is acceptable. The contracting officer, in concert with the Contracting Officer's Technical Representative, will accept or reject the product, (reference VA Handbook 0100, Metrics). WAGE DETERMINATION APPLICABLE TO THIS PROJECT: Davis Bacon -General Decision Number: IL20210002 01/21/2022 PROPOSAL DUE DATE: 03/02/2022 at 12:00 PM CDT Basis for Award: Lowest Price Technically Acceptable Offer SAFETY OR ENVIRONMENTAL VIOLATIONS AND EXPERIENCE MODIFICATION RATE All Bidders/Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder's/offeror's insurance company and be furnished on the insurance carrier's letterhead. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$2,967,832.00

Public - Federal

Renovation

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Post-Tensioned Concrete, Concrete Curing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Roof Moisture Survey, Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Paver Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Resilient Tile Flooring, Terrazzo Flooring, Carpeting, Access Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Signage, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Printers, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Furnishings and Accessories, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Packaged Outdoor HVAC Equipment, Packaged, Outdoor, Central-Station Air-Handling Units, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Overcurrent Protective Device Coordination Study, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Motor-Control Centers, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Transient Voltage Suppression, Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Communications Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
465
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2022

May 6, 2022

img_map_placeholder

2401 W Main St, Marion, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovate Building 15

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.