Site work, paving and new construction of a mixed-use development in Saint Charles, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City reserves the right to reject any and all bids, offers, or proposals submitted, or to advertise for new bids with the MoDOTs concurrence. The City reserves the right to defer the acceptance of any proposal and the execution of a contract for a period not exceeding one hundred twenty (120) days after the date of opening of the bids. The successful bidder to whom the contract has been awarded shall sign the contract and performance bond and other required certificates in triplicate and return the signed documents within fifteen (15) days after the date of their receipt. The bid proposal shall be made on a form of proposal, provided in the specifications and delivered in a sealed envelope clearly marked on the outside Bid No. 4679 to the Public Works Office on or before the time specified above. No facsimiles will be accepted. The proposal shall be accompanied by a bid bond, certified check or cashier's check of a bank or trust company in St. Charles County, City of St. Charles, St. Louis County, or in the City of St. Louis for an amount not less than five (5%) percent of the bid amount. The amount of the check shall be forfeited to the City if the bidder neglects or refuses to enter into a contract or to furnish bond after their proposal has been accepted. This project includes, but is not limited to, removals including a collapsed bridge abutment, furnishing and installing a new 80 long x 8 wide prefabricated pedestrian truss bridge, construction of pile supported concrete abutments and wingwalls, excavation and rock blanket placement for slope stabilization, construction of approximately 39 feet of 8 wide concrete sidewalk, furnishing and installing pedestrian fencing, furnishing and installing light poles, and mobilization. Calendar Days: 45 Calendar Days from Construction Notice to Proceed. Liquidated damages per day = $500

Award

Bridges / Tunnels

$460,540.00

Public - City

New Construction, Paving, Site Work

22

8

4

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
826
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

August 21, 2023

img_map_placeholder

500 S Riverside Dr, Saint Charles, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.