Renovation of a detention facility in Saint Charles, Missouri. Conceptual plans call for the renovation of a detention facility.

The Offeror has overall responsibility for, and shall provide, complete Pre-Construction Phase and Construction Phase Services and furnish all materials, equipment, tools, and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner's requirements and the terms of the Contract Documents. All questions or clarifications concerning this RFP must be submitted in writing via Email to: Kurt Mandernach, Purchasing Manager St. Charles County Government Finance Department 201 North Second Street St. Charles, Missouri 63301 kmandernach@sccmo.org A 100% Performance and Payment Bond in favor of the Owner. The Security Co. representing Contractor must be authorized to do business in the State of Missouri and be approved by Owner. Performance and Payment bond will be required if project is $50,000.00 or greater. The County must receive all questions no later than 2:00 PM on 7/10/23. Any question received after this deadline may not be answered. The total project budget is $40 million, which includes all soft costs, furniture, fixtures, and equipment, as well as direct construction cost. This is generally subdivided into fifth floor improvements of $15 million, and third floor improvements of $25 million. The third-floor improvements are funded through the American Rescue Plan Act program which has specific requirements in both schedule and recordkeeping. The work described must be constructed and completed by the end of 2026 to meet federal funding guidelines. All funding for the third floor must be committed and contracted by December 2024. The gross square footage of the fifth-floor area to be renovated is approximately 12,000 square feet. The third-floor area is approximately 28,000 square feet.

Project Abandoned

Jails / Prisons

$40,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
826
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

November 21, 2023

img_map_placeholder

301 N 2nd St, Saint Charles, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.