BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Milton Freewater, Oregon. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Work consists of installing an agency purchased prefabricated modular steel 82-foot single-span bridge over the south fork of the Walla Walla River, along with bridge approach road improvements, together with all other Work required to complete the Project as shown on the Drawings and specified herein. The prefabricated steel bridge will be available for delivery to the site on February 1, 2022. The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law. This Project is being funded by the Oregon Department of Transportation State-Funded Local Project Program. Buy America statute under Title 23, United States Code, Section 313 applies to this project. Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses should indicate they are a minority on the Planholders List. Est. Value Notes: $500,000 to $600,000 The Issuing Office for the Bidding Documents is: Anderson Perry & Associates, Inc, 214 E. Birch Street, Walla Walla, Washington 99362, Eric Zitterkopf, P.E., 509-529-9260, ezitterkopf@andersonperry.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$600,398.00

Public - County

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
20
Bidding Soon
308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

February 7, 2022

Project location map

Multiple Locations, Milton Freewater, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.