Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Boulder Creek, California. Completed plans call for site work for a water / sewer project.
The San Lorenzo Valley Water District proposes to install: o Approximately 4,025-feet of 8-inch ductile iron water main on Alta Via Drive and Prospect Avenue in Brookdale; o Approximately 1,883 feet of 6-inch ductile iron water main on Monan Way and Prospect Avenue in Brookdale, o New water services, fire hydrants and other miscellaneous improvements. The District is seeking proposals from consultants for construction management services. Plans and specifications for the Project have been prepared by the District and are available for review on the District web site. The estimated construction cost is $2.2M and there are 180 calendar days in the construction contract. The District intends to award a single construction management contract to a consultant firm qualified to do complete construction management for this project. Questions regarding this RFP should be submitted to the District's Engineer, Josh Wolff, via email atJWolff@SLVWD.com by 5pm on December 27, 2021. Failure to comply with the requirements of this RFP may result in disqualification. The Consultant shall provide overall project management. The Consultant shall assume at least one meeting each month with District management staff during the construction portion of the project and additional meetings to review project status at key milestones. Meetings will be held at the District's main office. The Consultant shall provide internal quality control and quality assurance procedures. A. Construction Management Services 1. Issue necessary clarifications and interpretations of the contract documents as appropriate to the orderly completion of contractor's work. Such clarifications and interpretations will be consistent with the intent of and reasonably inferable from the contract documents. 2. Review, approve and monitor traffic control plans. 3. Coordinate the submittal process by transmitting to the appropriate design professional for compliance with construction documents. Develop and maintain files of approved submittals. 4. Establish and hold weekly progress and coordination meetings with SLVWD and the Contractor at the site during active on-site construction phase. Prepare the agenda and summary notes for weekly meetings and review the Contractor's schedule. Monitor Contractor's compliance with submitted schedule. Request new schedules as they become outdated due to changes. Summarize project progress and include the status of change orders, of contract days remaining, work completed, adherence to schedule, and work in progress. 5. Visit the site each working day during the active on-site construction phase as necessary to observe the work and document compliance with the plans and specifications. Confirm that materials and installation methods used are those specified in approved submittals or the contract documents. Photographically document the progress of the work daily. Review traffic control. Prepare daily site observation logs that document progress of work performed, labor and equipment on site, and communications with the Contractor. 6. Review Contractor's progress payment requests and provide recommendations regarding payment in accordance with the work complete and the contract documents. 7. Assist with Contractor coordination with the utility companies, PG&E, Comcast, AT&T, Verizon, Sprint, etc. 8. If a change order request is presented by the Contractor, Consultant shall review the request, communicate with SLVWD, the Contractor, and any involved inspection/testing sub-consultants, and provide a recommendation to the District. Consultant shall maintain current records and documentation for all change orders, along with changes in contract days and contract dollar amount. 9. Review test reports and notify the District and the Contractor regarding reports indicating non-conforming items. Coordinate with the Contractor and the special testing and inspection sub-consultants, to resolve variations in the work from that specified in the construction documents. 10. Prepare a final punch list of items not yet satisfactorily completed and visit the project site to verify completion of those items. 11.Obtain letters of final acceptance from the associated design professionals summarizing their observations and conformance with the project plans and specifications. 12.Obtain record drawings from the associated design professionals based on Contractor's as-built drawings, site observation logs, and RFI logs for District records. 13. Review construction for adherence with the project plans and specifications.
Post-Bid
Water / Sewer
$2,200,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2022
March 4, 2022
Multiple Locations, Boulder Creek, CA
Related To This Project
Boulder Creek, CA
Bid Date: Jan 25 2022
Boulder Creek, CA
Bid Date: Sep 13 2022
Boulder Creek, CA
--
Boulder Creek, CA
--
Boulder Creek, CA
--
Boulder Creek, CA
Bid Date: Jul 18 2024
Boulder Creek, CA
--
Boulder Creek, CA
--
Boulder Creek, CA
Bid Date: Dec 29 2021
Boulder Creek, CA
Bid Date: Aug 08 2023
Boulder Creek, CA
Bid Date: Jul 21 2023
Boulder Creek, CA
Bid Date: Mar 30 2023
Boulder Creek, CA
Bid Date: Mar 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.