Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work for a civil project in Boulder Creek, California. Design plans call for site work for a water / sewer project.

Per the owner, as of August 6, 2025, the same civil engineer has been awarded for all 5 water tanks. Advertising for bidding is expected in December 2025 and January 2026. Due to funding ending in December 2026, construction would run a 300-day contract in 2026 after the project has been awarded. The closed solicitation is listed below for reference: ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Department of Water Resources Urban Community Drought Relief (DWR) Water Storage Tanks Replacement Project includes the design of five tank sites to replace existing tanks and design of a new pump station at one of the tank sites for the San Lorenzo Valley Water District (SLVWD) system. The District's intent is to enter into a single design agreement to an engineering firm qualified to prepare the required design plans, details, and specifications; for construction of the project to be bid as three separate packages. The District proposes to construct five new potable water storage tanks with usable 120,000- gallon water storage to replace existing tanks that are undersized, leaking and extremely vulnerable to wildfire at five District sites. The Consultant shall evaluate each site to determine if the increased tank capacity is feasible, and shall coordinate any change in proposed tank volume with the District. The project will generally include design of site improvements for construction of the new tank, design of a new SCADA system to integrate with the existing District SCADA system, design of a new pump station and all required piping and appurtenances necessary to connect proposed facilities to the existing District facilities. The District anticipates the prefabricated tank design will be provided by the tank manufacturer as a deferred submittal by the Contractor meeting the design requirements specified in the contract documents. The scope of tank design generally includes: tank dimensional sizing, to include seismic analysis and slosh volume; geotechnical analysis of tank sites; foundation or footing design; tank design requirements, to include access, venting, and mixing system design; yard piping and valving design; tank site layout; stormwater and erosion control design, both temporary for construction and permanent infrastructure. The scope of pump station design will be predicated on tank site elevations. At a minimum, the scope shall include analysis of required pump specifications; design of fire-hardened pump station; foundation or footing design; associated piping; vaults; valving; SCADA and electrical power connections. Since the pump station is not financed with the DWR grant the costs for the design and construction of the pump station will need to be tracked separately for the project. All tanks, pumps, distribution mains, transmission mains, and services shall be designed in accordance with CA-DDW Waterworks Standards. All materials, appurtenances, installation and testing procedures shall comply with ASTM and/or AWWA standards, as well as the SLVWD's water system construction standards. All designed work to be in conformance with District, County, State, and AWWA requirements.

Design

Water / Sewer

$590,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
57
Bidding Soon
2,427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

Multiple Locations, Boulder Creek, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.