Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a municipal facility in Park Forest, Illinois. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.
Build-out project for 361 Artists Walk in DownTown Park Forest, Park Forest IL. 60466. Per the Village of Park Forest policies, all contractors are to pay prevailing wages, be licensed and bonded with the Village of Park Forest Demo: Remove suspended ceiling tiles, grid, hanging wires. Remove non essential material from ceiling General Construction: Finish framing and drywall both sides of east wall. Move walk thru opening west wall. Drywall wrap window opening. Repair/replace drywall, tape and sand ready for paint as needed. Frame and drywall mechanical and rest room walls floor to ceiling. Install suspended ceiling in rest room, white grid and non directional ceiling tiles. Install 2- pre-hung 3' x 6'8" paint grade doors and trim. Install lever handle door knobs. Grab bars, mirror, and tp holder in washroom. Build shelf in mechanical for hot water heater. Install 12x12 Armstrong Excelon vinyl tile and vinyl base in washroom and mechanic. Install an approx 6'x6' ramp at double doors. Demo: Remove ceiling wires from barrel roof. Remove non essential material (piping, brackets, etc), from ceiling. General Construction: Frame and drywall new north wall 6" from existing demising wall from steel beam to east wall Soundproof and drywall 40' wall from floor to bottom of roof truss. Sound board supplied by others. Frame loft walls and drywall from loft deck to roof deck. Drywall area behind roof truss on upper existing north wall. Finish taping existing drywall. Section-3: General Construction: Frame and drywall box around concrete pier and roof drain. Frame and drywall steel beam to except suspended ceiling. Install framing and drywall above and below windows. Install framing, insulation and drywall south wall to steel beam. Install white suspended ceiling and non directional 2x4 ceiling tile Sprinklers: Remove and replace existing sprinkler heads. Add sprinkler heads as needed per code. Hvac: Payne or equal Install 2 Payne 95% single stage furnaces PG95ESA. Install 2 Payne 5-ton R-410A condensers PA13NA Install 2 Payne 5-ton R-410A cased coils CNPVP Install all lines sets from indoor coil to outdoor condensers. Install exposed spiral supply and return duct work. Install supply and return grills. Install all flues from furnaces out back wall. Install condensing units in south court yard. Install 2 Honeywell programmable thermostats. Electric: Install meter socket tied into electric cabinet. Install 200 amp circuit panel. Install 2- exit/ emergency signs. 3- emergency lights Install exhaust fan vented to the outside. Install wiring for 2- furnaces and ac units. Install wiring for hot water heater. Install 4- 2x4, led lay in light fixtures in section 3. Install 1 -2x2 led lay in light fixture in restroom. Install 6- surface mounted led lights fixtures section 1. Install 2- window outlets section 3 The budget for this project is $75,000 to $150,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Municipal
$61,152.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2022
April 1, 2022
Multiple Locations, Park Forest, IL
Related To This Project
Park Forest, IL
Bid Date: Mar 21 2022
Park Forest, IL
Bid Date: Nov 28 2023
Park Forest, IL
Bid Date: Jan 23 2024
Park Forest, IL
Bid Date: Jan 23 2024
Park Forest, IL
Bid Date: Jan 16 2024
Park Forest, IL
Bid Date: Jan 11 2024
Park Forest, IL
Bid Date: Jan 23 2024
Park Forest, IL
Bid Date: Mar 13 2024
Park Forest, IL
Bid Date: Feb 25 2022
Park Forest, IL
Bid Date: Mar 21 2022
Park Forest, IL
Bid Date: Mar 10 2022
Park Forest, IL
Bid Date: Jun 14 2019
Park Forest, IL
Bid Date: Feb 14 2022
Park Forest, IL
Bid Date: Feb 22 2022
Park Forest, IL
Bid Date: Dec 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.