BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Manteo, North Carolina. Completed plans call for site work for a water / sewer project.

**As of January 3, 2021, project has not been awarded. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Installation of a maximum of 710 units of 10-foot section sand fencing along 9,200 linear feet of Cape Hatteras National Seashore in front of the Village of Avon south of the Avon Pier as identified on the Drawings. Sand fencing shall be madeofbiodegradablematerialandinstalledas 10-foot-long sections spacedat approximately 7 feetonadiagonal alignment. Installation of a maximum of 225 units of 10-foot section sand fencing along 3,300 linear feet of Cape Hatteras National Seashore in front of the Village of Buxton as identified on the Drawings. Sand fencing shall be made of biodegradable material and installed as 10-foot-long sections spaced at approximately 7 feet on a diagonal alignment. Installation of a maximum of 88,000 plants (24 inches apart) on the newly nourished dune crest and dune face along 9,200 linearfeet of Cape Hatteras National Seashore in front of the Village of Avon south of the Avon Pier as identified on the Drawings. Only native, salt-tolerant plant species (for example, American Beachgrass, Sea Oats, and/or Bitter Panic Grass) shall be installed. Installation of a maximum of 44,500 plants (24 inches apart) on the newly nourished dune crest and dune face along 3,300 linearfeet of CapeHatterasNational Seashore in frontofthe Village ofBuxtonas identified on theDrawings. Only native, salt-tolerant plant species (for example, American Beachgrass, Sea Oats, and/or Bitter Panic Grass) shall be installed. Total Bid price to install a maximum of 935 units of 10-foot section sand fencing and a maximum of 132,500 plants (24 inches apart) along the 12,500 linear feet of Avon and Buxton oceanfront (ie - sum of Bid Items 1, 2, 3, 4): Bid Results- 1.Bid Item 1 (710 Units sand fencing along Avon - Emerald Forest Inc. - $ 35,546 2.Bid Item 2 (225 Units sand fencing along Buxton) - Coastal Transplants-$ 11,429 3.Bid Item 3 (88)000 plants along Avon) - Coastal Transplants-$ 16,068 4.Bid Item 4 (44,500 plants along Buxton - Coastal Transplants-$ 8,086 5.Bid Item 5 (Total price of Items 1-4) - Coastal Transplants-$ 74,119

Award

Water / Sewer

$74,119.00

Public - County

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
35
Bidding Soon
446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2021

November 16, 2022

Project location map

Multiple Locations, Manteo, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.