EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a military facility in Petaluma, California. Completed plans call for the renovation of a military facility.

As of September, 2022, an award and timeline for construction have yet to be announced. In May of 2022, the USCG needed new funding before they award anything further. All Solicits said they were waiting on Funding, and would wait 120 to 180 days from the time of proposal until they award. Provide all supervision, materials, tools, labor, and equipment required to accomplish the task. Work includes, but is not limited to: Renovation of three bathrooms (heads), six berthing rooms, and two laundry rooms located on the first floor of Mace Hall, Building 130. South wing bathroom (Room 103) shall be modified to provide one uni-sex ADA compliant head with a roll-in shower and one bathing room for two occupants. Room 105 shall be converted into an ADA compliant laundry room. North wing's bathroom (room 130) shall be modified to provide two uni-sex, single use bathrooms (one ADA compliant, one standard) with a shared trough sink at the entrance to the bathrooms. Central "gang" style bathroom shall be modified to provide two bathrooms, each with three (3) showers, three (3) toilets, three (3) sinks, and a counter. Showers in these bathrooms include a dry changing area immediately adjacent to them. Six berthing rooms shall be modified to provide two berthing (sleeping) spaces, and a lounge with a kitchenette. Modifications and/or updates to the existing fire alarm system to support the new design are included in the scope of work. There are two option items: Replacement of exterior windows in the work area and electrostatic windows for the interior windows. All accessories as well as finishes required to complete the SOW are included within this specification, unless notes as "Government Furnished". Design and Engineering services including Architectural, Structural, Mechanical, Plumbing and Electrical shall be design build. Lead and Asbestos are present in these areas and remediation is required. Refer to Asbestos and Lead report provided within this specification, and drawings for further information.

Under Construction

Military

$500,000,000.00

Public - Federal

Renovation

8

9

9

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Decking
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
107
Bidding Soon
1,801
All Active Projects
863
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

January 23, 2023

img_map_placeholder

599 Tomales Rd, Petaluma, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

M&R Bathrooms & Berthing Mace Hall

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.