BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Lincoln, Nebraska. Completed plans call for the renovation of a medical facility.

Aging Partners Food Services Equipment Victory Park located at 600 S. 70th Street, Building 2, East side The Work of this Contract consists of furnishing all plant labor, equipment appliances, material, and performing all operations in connection with the installation of all food service equipment in strict accordance with the specifications and applicable drawings for the project referenced herein. The Work of the FSEC shall include, but not be limited to the following: A. Material and equipment shall be new and the best of its respective kind, unless otherwise specified. The FSEC shall repair, refinish, or replace any equipment damaged in transit or during installation, to the satisfaction of the Consultant and Owner. All food service equipment and fixtures shall be clean and ready to use at the time the Project is turned over to the Owner. B. The FSEC shall hold all equipment in storage until construction is ready to receive the work of this contract. Coordinate the delivery of the equipment with the general construction schedule. All work under this contract must be completed by July 2022. C. The FSEC is responsible for the disconnection, transport and setting-in-place of all existing equipment. The project subcontractors will provide final utility connections to the existing equipment at the new site. D. All items of equipment shall be delivered and set in place during regular working hours, ready for mechanical and electrical connections, which will be made by others. The FSEC shall be responsible for coordinating their work with the General Contractor and all Mechanical and Electrical Contractors. Plumbing and electrical trim and connections to utilities are to be furnished by the respective trades involved. Final utility connections shall be made by the General Contractor's subcontractors and are not a part of the FSEC Work. Installation of fixtures and equipment and all final fitting, etc., shall be done in a neat and workmanship like manner by competent, experienced craftsmen in their respective fields. Final installations such as sealants and close-tolerant adjustments shall be made by the FSEC. Repair all damage done to the premises as a result of this installation and remove all debris left by those engaged in this installation. Substantial Completion of the project shall be July 20, 2022 and final completion shall be August 5, 2022, based on a notice to proceed of January 12, 2022

Award

Medical

$4,067,000.00

Public - City

Renovation

4

9

2

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
60
Bidding Soon
827
All Active Projects
352
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

January 12, 2022

August 5, 2022

img_map_placeholder

600 S 70th St, Lincoln, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.