EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work and addition to a medical facility in Selkirk, Manitoba. Completed plans call for site work for a medical facility; for the addition of a 25,861-square-foot, one-story above grade, 30-bed medical facility; and for the demolition of a medical facility.

The Selkirk Regional Health Centre (SRHC), 120 Easton Drive, Selkirk, Manitoba, is the largest facility within the Interlake East Regional Health Authority (IERHA) and is a regional hub. Completed in June 2017, the new 185,000 square foot facility more than doubled the size of its predecessor, the Selkirk & District General Hospital. The sustainably designed building is LEED Gold certified by the Canadian Green Building Council. The SRHC has 65 beds and provides health care service for Inpatients, Outpatients, Therapy Services, Clinics and Regional Services. As part of Manitoba's Clinical and Preventive Service Plan, SRHC will remain District Enhanced service profile to the Interlake-Eastern Regional Health Authority. The SRHC Inpatient Building Addition Project Scope of Work includes a new 30 bed inpatient addition and minor/medium renovation to the existing Emergency Department. The order of magnitude for construction for this project is approximately $27.96 Million ($27,960,000.00) CAD, exclusive of GST. The construction budget includes the Construction Manager fees for Services and Work. TIMELINE: Ground breaking has occurred. Site work for the addition is underway. Renovations of existing space to proceed fall 2022. The total cost of the project is expected to be approximately $31.6 million.

Under Construction

Medical

$31,600,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Project Management and Coordination, Project Meetings, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
24
Bidding Soon
282
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

September 5, 2022

img_map_placeholder

120 Easton Dr, Selkirk, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.