BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a bridge / tunnel in Wilkes Barre, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

Luzerne County is seeking proposals for Bridge Demolition for Daro Road (CB16007) and Hubbard Road (CB46016) projects. The Bridge Demolition Projects will consist of the full removal of two (2) truss bridge superstructures. The items of work are identified more specifically in the Project Specifications. The entire project will be awarded to one (1) Contractor. PA Prevailing Wages apply to this project. Contractors must be PennDOT prequalified. A certified check or bank draft, payable to the order of the County of Luzerne, negotiable US Government Bonds (at par value), or satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10% of the Total Bid of construction shall be submitted with each bid. The Successful Bidder will be required to furnish and pay for satisfactory Performance and Payment Bond, each in the amount of 100% of the Contract Price with a corporate surety approved by the Owner. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Bid may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. Owner shall reject all bids or award to the lowest responsive and responsible bidder within 60 days of the bid opening. Questions must be submitted, via Electronically by 5:00 PM on Thursday January 6, 2022. The proposed work includes the demolition of two (2) truss bridge superstructures that are to be removed from their current location and moved/stored at a nearby County Maintenance Facilty. The work also includes the installation of post mounted signs, concrete barriers, seeding and soil supplements, and the removal of existing guiderail.

Award

Bridges / Tunnels

$128,220.00

Public - County

Demolition, Site Work

4

9

2

6

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
96
Bidding Soon
1,163
All Active Projects
585
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 11, 2022

img_map_placeholder

Multiple Locations, Wilkes Barre, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.