BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kansas City, Missouri. Working plans call for site work for a water / sewer project.

Inflow and Infiltration (I/I) Reduction: Northern Basins Project 2 13% MBE participation and 11% WBE participation. Manhole Rehabilitation Pipe Segment Rehabilitation Existing Sanitary Sewer 1. All sewer main open cut point repairs shall be completed prior to CIPP lining of the sewer segment. 2. Open cut service lateral connection repairs located within a sewer main open cut point repair shall be performed at the same time and as part of the open cut point repair. 3. All open cut service lateral connection repairs (not part of a sewer main open cut point repair) and CIPP service lateral connection repairs shall be performed after CIPP lining of the sewer main. 4. Infiltration that will impact lining shall be grouted prior to CIPP lining of the sewer segment. 5. If a service lateral is replaced as part of a sewer main open cut point repair and prior to CIPP lining, the service lateral shall be CIPP lined following CIPP lining of the sewer main. The liner installed shall be a short liner (18-inches) no matter if the service is within the R/W or easement. 6. Where an active service lateral falls within a CIPP patch, the lateral shall be reinstated and a CIPP service lateral liner installed manholes receiving rehabilitation or replacement: 1. Contractor shall perform the necessary cleaning of manholes scheduled for rehabilitation work in the Manhole Rehabilitation Schedule. 2. Manhole frame and cover replacement shall be performed prior to cementitious lining of manholes. 3. Grouting of infiltration shall be performed prior to cementitious lining of manholes. 4. Where noted, Antibacterial Admixture and color tinting shall be added to cementitious lining prior to application in accordance with manufacturer's instructions. 5. Where noted, Corrosion Resistant Top Coat/Epoxy will be applied after surface preparation as specified in Section 03363. 6. Engineer will select cementitious lined manholes for vacuum testing inspection at random in accordance with Section 02702. 7. Pipe End Seal Liners shall not be installed until approved by Engineer. If pipe end seal liners are approved, all non-rehabilitated pipe including outside drops shall receive a pipe end seal liner The Contractor shall provide all concrete work, excavations, cleanup and restoration as required to complete the concrete construction

Final Planning

Water / Sewer

$4,344,650.00

Public - City

Site Work

33

13

6

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
715
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

February 10, 2022

img_map_placeholder

Multiple Locations, Kansas City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.