Site work for a civil project in Lampeter, Pennsylvania. Completed plans call for site work for a water / sewer project.

General Construction : $1,100,000 - $1,400,000 Electrical Construction : $400,000 - $450,000 Contract No. 21-1 - General Construction Contract No. 21-2 - Electrical Construction The Project consists of but is not limited to replacement of three (3) shaft driven dry pit submersible pumps and ancillary equipment with three (3) self-priming centrifugal pumps and ancillary equipment, replacement of pump discharge piping and valving, select structural concrete and sluice gate repair, and installation of a new self-priming suction lift chopper pump with suction and discharge recirculation piping, including all electrical and control improvements. Also included is the rehabilitation of the exterior surface of 16-inch ductile iron municipal wastewater force main piping within four existing valve chambers, the installation of 3-inch vent piping from three of the chambers, manhole rehabilitation and related site restoration. A pre-bid conference will not be held. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through electronically Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than electronically Clarification Deadline 1/4/2022 4:00 Pm Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid. Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public natural resources that affect the project, pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania, approved October 26, 1972. This Project falls under The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act ('the Act') which requires all public work contractors and subcontractors to utilize the Federal Government's E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form as a precondition for the Contract Award. The estimated cost for each Contract is greater than Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. All bids shall be irrevocable for 60 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). The East Lampeter Sewer Authority reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the East Lampeter Sewer Authority, and to reject any or all proposals. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$702,500.00

Public - City

Site Work

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Tiling, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Motor-Control Centers, Low-Voltage Distribution Equipment, Electrical Cabinets and Enclosures, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Harmonic Filters, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Landscape Grading
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
162
Bidding Soon
2,443
All Active Projects
1,121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Lampeter, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Stauffer Run Pump Station Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.