BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Binghamton, New York. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Estimated project value was quoted as under $50,000 BROOME DDSOO is seeking a vendor to create a med room at 291 Duell Rd in Binghamton NY. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to the drawings and below scope of work. Interested vendors must attend a required site visit as detailed on the below general requirements. Install new hardwood Dutch door with integrated shelf and new door trims. Remove existing flooring from entryway through the living room and prepare existing subfloor. Install new LVT flooring as shown in the attached drawing. Install cabinets, countertops, and hardware in new med room space and living room as shown in the attached drawing. Cabinet and countertop specs are detailed in the attached drawing. Install base trim on both sides of the new partition walls to match existing. Provide demo in the existing office area per the attached drawings. Run a Cat 6 Data line from the server in the office and install a computer jack on the countertop. Install two switches by the door of the med room to control an overhead light and two under cabinet lights. Install three 120v receptacles, one on the countertop, one on the new partition wall, and two on the living room wall. Existing receptacles to remain. A smoke detector will need to be installed in the med room. Contractor provide the sub-contractor and coordinate with them for the install. Job shall not be considered complete until all functions have been tested and confirm work in the presence of Plant Superintendent or designee. Contractor is responsible for removal and disposal of debris created during project and for cleaning or repairing any part of the facility damaged during work. Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor. Work shall conform to all applicable codes, be done according to manufacturer's instructions, and follow industry best practices. Service-Disabled Veteran-Owned Set Aside: No

Award

Municipal

$22,500.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
70
Bidding Soon
868
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2021

January 27, 2022

img_map_placeholder

291 Duell Rd, Binghamton, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.