BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in West Sacramento, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project will extend Riverfront Street approximately 0.15 mile as a two-lane roadway with sidewalks, lighting, and landscaping, from its terminus just south of Mill Street, underneath the highway, and terminate with a cul-de-sac. The Project will also widen 5th Street between Mill Street and 15th Street, construct a Class IV bikeway and sidewalk, underground overhead utilities on the east side of 5th Street, and install new wet utilities, lighting, and landscaping. 5th Street will be re-striped between Bridge Street and Mill Street to include a Class IV bikeway. Traffic signals at the 5th Street/Bridge Street intersection will be modified to accommodate new pedestrian crossings and the Class IV bikeway. Mill Street will be signed and striped to be a Class III bikeway. Question Submission Deadline:December 23, 2021, 5:00pm Question Response Deadline:December 29, 2021, 5:00pm Contractor Selection Date:January 19, 2022 The proposed work consists of City street construction and modification, traffic signal modifications, street light construction, underground joint trench utility and drainage system construction, Caltrans freeway ramp modifications, pavement marking and striping, roadway signage, and other ancillary work. As of July 22, 2024, construction on this project has been completed.

Occupancy

Roads / Highways

$6,614,000.00

Public - City

Outdoor Lighting, Paving, Site Work

57

11

104

2

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
81
Bidding Soon
1,548
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2022

March 14, 2022

img_map_placeholder

Riverfront St, West Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.