BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in West Sacramento, California. Completed plans call for site work for a water / sewer project.

The proposed work consists of the following: furnishing and placing new water mains, water services and laterals, water meters, digital registers, Smartpoint M2 Radio Transceivers (MXUs), water meter boxes and lids, blow off assemblies, air release valves, water valves, fire hydrant assemblies, electrical grounding rod assemblies and all related components necessary to complete the work as specified in the plans. Additional work includes abandoning existing backyard and front yard water mains, water services, and all related components necessary to complete the work as specified in the plans and these specifications. Salvaged items shall be returned to the City of West Sacramento Corporation Yard. In addition, the work shall include the replacement of any pavement, concrete sidewalk, concrete curb and gutter, concrete driveway, concrete valley gutter, and public or private landscaping and irrigation removed or damaged as a consequence of the execution of this Contract, as well as traffic stripes, pavement markings, and all necessary traffic control. Contractor should anticipate the dewatering of utility trenching during construction. WKA No. 13303.01P This project will replace approximately 11,000 feet of 8-inch and 12-inch existing water distribution pipe; approximately 8,000 feet within the Linden Acres west area and 3,000 feet within the Linden Acres east area Within the Linden Acres west area, there are 95 water service reconnections to existing front yard meters, Within the Linden Acres east area, backyard water mains and 97 backyard service are to be abandoned. New front yard meters and service line installations (main to meter and meter to house) will be required. Several of these service lines are long and will require multiple boring setups. There are 9 distribution tie-ins to the existing water distribution system within the entire project area. Several are to an existing 16-inch AC pipe that will require careful planning and coordination. There are 22 fire hydrant installations; several that will require the removal and abandonment of an existing fire hydrant.

Award

Water / Sewer

$4,585,890.00

Public - City

Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
81
Bidding Soon
1,548
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2022

February 28, 2022

img_map_placeholder

Multiple Locations, West Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.