BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Missoula, Montana. Completed plans call for site work for a water / sewer project.

***As of February 10, 2022, the project has been awarded for the amount of $498,802.22.*** The project generally consists of the installation of a replacement water main in Beckwith Avenue, between Rollins Street and Woodford Street, in Missoula, Montana. This includes installation of new 8" ductile iron water main, horizontal directional drilled water main, new fire hydrants, connections to existing mains, water service swaps, abandonment of existing mains, and restoration of disturbed areas. The Owner will cooperate with the successful bidder in setting the date of the Notice to Proceed, dated no later than May 30, 2022. Contract Time: 108 Calendar Days

Award

Water / Sewer

$498,802.00

Public - City

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
14
Bidding Soon
91
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 14, 2022

Project location map

Beckwith St, Missoula, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.