Published December 17, 2021 at 7:00 PM
Updated November 15, 2023
Site work for a water / sewer project in High Point, North Carolina. Completed plans call for site work for a water / sewer project.
Q/A Cutoff Date: 12/15/2021 Q/A Cutoff Time: 09:00 AM PS The contractor will provide all labor, materials, and equipment required for the completion and operation of all systems to replace the Hot Water Boiler System and two (2) 335-gallon Water Tanks. This includes all plumbing and all electrical work. To minimize tenant inconvenience, the project will be conducted in three (3) phases. In Phase One the contractor will install one (1) 335-gallon tank, rough-in all connections, and check for any leaks in the system. Once the first 335-gallon tank is online and verified to be working properly, the contractor will start Phase Two. In Phase Two the contractor will take both old tanks offline and remove them. The contractor will dispose of the old tanks properly, in an approved waste site. In Phase Three the contractor will install the second 335-gallon water tank, rough-in all connections, and check for any leaks in the system. The contractor will verify all operational aspects of the systems, call for appropriate inspection(s), and complete final connections. Contractor will install a backflow valve to meet the City of High Point requirements. Completion- 120 calendar day
Post-Bid
Water / Sewer
$100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2022
February 3, 2022
701 S Elm St, High Point, NC