BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in High Point, North Carolina. Completed plans call for site work for a water / sewer project.

Q/A Cutoff Date: 12/15/2021 Q/A Cutoff Time: 09:00 AM PS The contractor will provide all labor, materials, and equipment required for the completion and operation of all systems to replace the Hot Water Boiler System and two (2) 335-gallon Water Tanks. This includes all plumbing and all electrical work. To minimize tenant inconvenience, the project will be conducted in three (3) phases. In Phase One the contractor will install one (1) 335-gallon tank, rough-in all connections, and check for any leaks in the system. Once the first 335-gallon tank is online and verified to be working properly, the contractor will start Phase Two. In Phase Two the contractor will take both old tanks offline and remove them. The contractor will dispose of the old tanks properly, in an approved waste site. In Phase Three the contractor will install the second 335-gallon water tank, rough-in all connections, and check for any leaks in the system. The contractor will verify all operational aspects of the systems, call for appropriate inspection(s), and complete final connections. Contractor will install a backflow valve to meet the City of High Point requirements. Completion- 120 calendar day

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
95
Bidding Soon
1,541
All Active Projects
590
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2022

February 3, 2022

img_map_placeholder

701 S Elm St, High Point, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.