Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 25, 2022 at 7:00 PM

Updated January 29, 2024

Renovation of a municipal facility in Selmer, Tennessee. Completed plans call for the renovation of a municipal facility.

Remove One (1) existing Cast Iron Burnham Boiler Model V-907 Replace with new Lochinvar firetube boiler Model FT850-M13 or Equivalent. INCLUDING: Min Thermal Eff - 97% Min Turndown - 7:1 HX material: 316L SS Labor and Materials for Installation including: Flow Switch Motorized Isolation Valve Condensate Neutralization Kit New Hot Water Piping as required Brass Well for System Sensor ASME relief valve to floor drain Pipe Neutralization Kit to drain Electrical wiring needs to be 120v/1ph Wire motorized isolation valve (120v) to boiler pump terminals New 6" CPVC flue for boiler, run all the way up and out Reconnect gas, provide factory startup and owner training ALT BID: Provide additional bid to replace 2nd boiler with same specs as covered in the base bid. McNairy County Government operates and services without regard to race, color, and national origin in accordance with Title VI of the Civil Rights Act. McNairy County reserves the right to reject any or all bids or responses and to award the contract as deemed in the best interest of the County.

Award

Municipal

$55,235.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
47
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

Project location map

To Be Determined, Selmer, TN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed