Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Shawano, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Route: STH 029W County: 58 - Shawano County Limit - Slope Stabilization B- 58-0075 Solicitation ID: NC-05 The roadway and structure need treatment to extend their service lives. Anticipated Construction Cost: $1,000,000-$1,999,999 Perpetuation project to stabilize the soil and reinforce the abutments and embankments of the WIS 29 (B-58-75) bridge over the Wolf River between Shawano and Green Bay in Shawano County. Coordination with WisDOT Geotechnical staff, drainage improvements, pavement joint repairs and concrete pavement slab repairs on WIS 29 westbound lanes between WIS 22 and the existing bridge are also needed. The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at site. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WIDOT - RFP Engineering - Shawano - Green Bay *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$2,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2022
WI-29 Trunk, Shawano, WI
Related To This Project
Shawano, WI
Bid Date: Oct 10 2018
Shawano, WI
Bid Date: Jan 11 2022
Shawano, WI
Bid Date: Jan 17 2022
Shawano, WI
Bid Date: Feb 24 2022
Shawano, WI
Bid Date: Mar 15 2022
Shawano, WI
Bid Date: Dec 21 2021
Shawano, WI
Bid Date: Apr 05 2022
Shawano, WI
Bid Date: Apr 05 2022
Shawano, WI
--
Shawano, WI
Bid Date: Jul 10 2023
Shawano, WI
--
Shawano, WI
--
Shawano, WI
--
Shawano, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.